Document Types: San Anselmo Flood Risk Reduction Project
Map of Proposed SAFRR Project Option 2A
Preferred project 10yr water surface elevation parcels with 3ft or more reduction
Hydraulic Analysis of Sunnyside Detention Basin (2018)
Draft Environmental Impact Report Notice of Availability (2018)
Frequently Asked Questions (2018)
Nursery Flood Diversion and Storage Basin Operations Narrative (2018)
Community Meeting (2017)
Meeting date: May 3, 2017