Skip to content
Skip to navigation
Site map
An official website of the Marin County Department of Public Works
Action toolbar
Translate
Translate language select
Search
Marin County Flood Control District
Primary menu links
Watersheds
Flood protection
Projects
Meetings
News
About
Marin County Flood Control District
Projects
Proposed Santa Venetia Floodwall Project
Documents
Proposed Santa Venetia Floodwall Project documents
Zone 7 Advisory Board Meeting Presentation: October 13, 2022
Download
Draft Marin County Repetitive Loss Area Analysis
Download
Santa Venetia Floodwall Basis of Design and Project Alternatives
Download
Santa Venetia Storm Drain Hydraulic Study Final Report (GHD, 2015)
Download
Las Gallinas Creek – Hydrologic, Hydraulic and Coastal (U.S. Army Corps of Engineers, 2013)
Download
Geotechnical Data Report – Las Gallinas Levee System – San Rafael, California (Kleinfelder, Inc., 2013)
Download
Las Gallinas Creek, CA – Preliminary Flood Damage Analysis (U.S. Army Corps of Engineers, 2014)
Download
Geotechnical Alternatives Analysis, Las Gallinas Levee System, San Rafael, California (Kleinfelder, Inc., 2014)
Download
CAP 205 Study Termination Letter for Las Gallinas (U.S. Army Corps of Engineers, 2017)
Download
Zone 7 Advisory Board Meeting Presentation: August 21, 2019
Download
Cross section of Timber-Reinforced Berm
Download
Elevation map of Zone 7 floodplain
Download
Proposed Santa Venetia Levee Upgrade Project map
Download
Gallinas Levee Upgrade new levee pilot plan set, September 2020
Download
Gallinas Levee Upgrade FEMA grant award press release, 2019
Download
Gallinas Levee Upgrade subzone 7A Resolution of Intent (Approved), October 2020
Download
Gallinas Levee Upgrade Benefit Assessment District draft engineer’s report, October 2020
Download
Gallinas Levee Upgrade flood barrier study technical memo, June 2020
Download
Gallinas Levee Upgrade second survey outreach letter, May 2019
Download
Gallinas Levee Upgrade first survey outreach letter, April 2019
Download
Drone Lidar Flight survey results, June 2019
Download
Gallinas Levee Upgrade Project Notice of Availability for the Draft Initial Study, July 2019
Download
Gallinas Levee Upgrade initial study, June 2019
Download
Gallinas Levee Upgrade Project initial study response to comments, October 2019
Download
CEQA Initial Study
Gallinas Levee Upgrade Project Notice of Availability for the Draft Initial Study, July 2019
Download
Gallinas Levee Upgrade initial study, June 2019
Download
Gallinas Levee Upgrade Project initial study response to comments, October 2019
Download
Helpful
Share
Facebook
Twitter
Email
Size
+
Reset
a
−
This content is for decoration only
skip decoration
.
Close window
Search Site
Search
Close window